CleanCut
Under 1 week
An engineer starts on your spec, sketch or sample part.
Engineering
The 4–8 week wait is common at large converters. Here, a packaging engineer who works on the cutting floor reviews your spec, sketch or sample part, and tells you what will cut, tear or seal badly and what we'd change.
The wait, compared
The time from sending what you have to a packaging engineer working on your project.
Under 1 week
An engineer starts on your spec, sketch or sample part.
4–8 weeks
A common wait for engineering time on a new project.
This is the wait for engineering work, not for a quote. We still reply within one business day, and aim to quote parts we cut within two business days of having what we need.
What our engineers do
Our advice helps you decide. You approve the spec, and you validate the package.
We review outlines, holes, slots, tabs, corner radii and the material you've picked, and tell you what will cut, tear or seal badly and what we'd change. Tolerances are quoted per part.
No spec yet? Send a sketch, a photo, a 3D model or a sample part. We draw the die-line for you to approve, free for parts we quote.
Lids, cards, rollstock and pouches chosen to suit your tray, your device and your sterilization method. Our chart rates each product for EtO, gamma, e-beam and steam. Where it says “Ask us”, ask our engineer.
Quantities, lots and documents for your ISO 11607 validation build: how many parts the test plan needs, including set-up and retests, how lots should appear in the build, and which documents to ask for. You validate the package; we supply the parts and the paperwork.
How it works
A PDF, DXF, DWG, STEP or IGES file, your customer's spec with its revision, or a sketch or sample part if you have no spec yet. Add the material if you know it, and your tray or pouch.
We check the geometry, material and critical tolerances, tell you about anything that will cut, tear or seal badly and what we'd change, and aim to quote within two business days of having what we need, for the parts we cut. If the part needs engineering work first, an engineer starts on it in under a week, not the 4–8 weeks common at large converters.
Quick-turn samples cut from the production material.
Seal, sterilize and test the parts on your own line and cycle. If the package is already validated, check the first parts against the approved spec. A first-article inspection report is available on request.
Small runs or full volumes, shipped to Canada, the US and the EU.
Checklist
Send what you have. Nothing on this list is required to start the conversation.
FAQ
In under a week, not the 4–8 weeks common at large converters. That is the wait until a packaging engineer is working on your project. It is not the quote time or the time to finish the design.
The times we already publish still apply:
Yes, for parts we quote. Reviewing your spec, sketch or sample, suggesting changes, advising on material and planning a validation build are part of quoting. We draw the die-line for you to approve, free for parts we quote.
The cutting die is quoted once, as a separate line from the part price, and you own it once it is paid for.
Yes. Send the approved spec, its revision and the material callout.
No. The device maker, or the contract manufacturer that seals for them, validates the sterile barrier system to ISO 11607-1 and ISO 11607-2.
We help you plan the parts side of a validation build: how many parts to order, how lots should appear in the build, and which documents to ask for. We cut validation lots on the production die and process, and ship them with a certificate of conformance and lot records. We don't validate your package or claim compliance on your behalf.
Start a project
Yours or your customer's. We'll reply within one business day, and an engineer starts on your project in under a week, not the 4–8 weeks common at large converters.